South Falcon East Uranium Project Drill Program
Sector: Nuclear • Location: Vancouver, Saskatchewan, Canada
Source: Toronto Star
Terra Clean Energy Corp. is preparing to commence a targeted drill program on the Fraser Lakes B Uranium Deposit at the South Falcon East Project. The program will consist of up to 2,500 meters of drilling to test key geological features indicative of higher-grade uranium mineralization. The drill program is planned for late summer 2026 and will be helicopter supported with an expected budget of C
- Status
- Prospective
- Sector
- Nuclear
- Location
- Vancouver, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Toronto Star
ConstructChat
Ask ConstructChat about South Falcon East Uranium Project Drill Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Terra Clean Energy Corp. is preparing to commence a targeted drill program on the Fraser Lakes B Uranium Deposit at the South Falcon East Project. The program will consist of up to 2,500 meters of drilling to test key geological features indicative of higher-grade uranium mineralization. The drill program is planned for late summer 2026 and will be helicopter supported with an expected budget of CAD $1.75 million. |
Original sector | Mining |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Vancouver |
Source
Source | Toronto Star |
URL |
More Details
Record type | Project |
Sector | Nuclear |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Nuclear projects in Canada
- Lac Seul Hydroelectric Power Plant
- MDS Nordion Office
- Ligne à 735 kV Micoua-Saguenay
- Winkler-Stanley-Morden Regional Wastewater Treatment System: Phase 1
- Horizon Oil Sands Project – Developed by Canadian Natural Resources Ltd
- BC Cancer Agency Centre for the North
- Ottawa Regional Cancer Centre (Ottawa Hospital)
- Darlington Wastewater
