logo

SOUTH FORK PEACHTREE CRK-GREENWAY TRAIL IN DEKALB CO - PH IV

Sector: Forest Products and Packaging • Location: North Decatur, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The project would begin at the proposed trailhead at the intersection of McConnell Drive and the southern corner of the Mason Mill Park tennis court parking lot. The trail would continue in a northeasterly direction to a proposed trailhead along North Druid Hills Road near the existing intersection of North Druid Hills Road and Spring Creek Drive. The proposed design for Phase IV of the South Fork

Project Information FAQ

Project Information

4 Q
The project “SOUTH FORK PEACHTREE CRK-GREENWAY TRAIL IN DEKALB CO - PH IV” is an infrastructure initiative in the Forest Products and Packaging sector, located in North Decatur, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project would begin at the proposed trailhead at the intersection of McConnell Drive and the southern corner of the Mason Mill Park tennis court parking lot. The trail would continue in a northeasterly direction to a proposed trailhead along North Druid Hills Road near the existing intersection of North Druid Hills Road and Spring Creek Drive. The proposed design for Phase IV of the South Fork Peachtree Trail includes 0.86 mile (4,565 linear feet) of multiuse trail. Approximately 0.5 mile of the trail (2,620 linear feet) would be constructed as a 12-foot wide boardwalk, and 0.36 mile (1,880 linear feet) would be a 10-foot wide concrete paved trail with 2-foot shoulders. A total of three bridges will be constructed, including one timber bridge over an Unnamed Tributary to Burnt Fork Creek, and two steel bridges over Burnt Fork Creek.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data