logo

South Fraser Perimeter Road (Highway 17), British Columbia

Sector: Bridge • Location: Canada

Source: Road Traffic Technology

Project
Closed

SFPR includes four lanes with two lanes in each direction, separated by a median or grade. The project generated an estimated 7,000 permanent jobs in Delta and Surrey. The South Fraser Perimeter Road (SFPR) is a 40km-long highway extending from Deltaport Way in south-west Delta to 176th Street on Highway 15 in Surrey, British Columbia, Canada. It provides connections to Highways 1, 17, 91 and 99 a

Project Information FAQ

Project Information

5 Q
The project “South Fraser Perimeter Road (Highway 17), British Columbia” is an infrastructure initiative in the Bridge sector, located in Canada. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SFPR includes four lanes with two lanes in each direction, separated by a median or grade. The project generated an estimated 7,000 permanent jobs in Delta and Surrey. The South Fraser Perimeter Road (SFPR) is a 40km-long highway extending from Deltaport Way in south-west Delta to 176th Street on Highway 15 in Surrey, British Columbia, Canada. It provides connections to Highways 1, 17, 91 and 99 and the Golden Ears Bridge. Construction on the South Fraser Perimeter Road started in January 2009 and was completed in December 2013. On December 1 2012, SFPR was designated as Highway 17 and the existing Highway 17 was changed to 17A. The $1.26bn highway project was undertaken as a part of British Columbia’s Gateway Programme and the Government of Canada’s Asia-Pacific Gateway and Corridor Initiative. The SFPR has created a better transportation network and contributes towards the economic development in the region. The project generated an estimated 4,000 construction jobs and another 7,000 permanent jobs. British Columbia launched the Gateway Programme in 2003 to relieve congestion and develop a better transportation network within Metro Vancouver. The four projects included in the programme are Port Mann / Highway 1, Pitt River Bridge, Mary Hill Interchange Project and SFPR. SFPR includes four lanes with two lanes in each direction, which are separated by a median or grade. The highway project included the construction of a number of bridges, intersections, interchanges and roadways. It has a speed limit of 80km/h and serves all types of traffic. The highway also includes cycle pathways adjacent to major streets. The project was opened to traffic in two phases. The first phase, the 10km-long east section from 176th Street on Highway 1 to 136th Street on Highway 15 in Surrey, opened on 1 December 2012. The second phase, extending from 136th Street in Surrey to Delatport Way in Delta, was opened in December 2013. The Canadian Government contributed $365m for the project, with British Columbia providing the remaining $899m. SFPR has created a new transportation network and contributes towards enhancing the province’s road network. It provides access to the US border, Tsawwassen ferry terminal and better connectivity within British Columbia. SFPR also improves the economy by promoting enhanced mobility, as well as safe and efficient transportation on the south side of the Fraser River. The new route facilitates better mobility of goods and people, and supports public transportation and cycling. Truck traffic is diverted from local municipal roads on to the main highways. Municipal roads are, therefore, the primary community connectors. This reduces travel time and air pollution, as well as increases safety and reliability along the road. Better connectivity to industrial areas also uplifts the business markets in Delta and Surrey. An extensive environmental study was carried out to make sure that the project has no adverse impact on the environment and agricultural lands. The plan included measures to improve water management systems, agricultural irrigation systems, enhancement to fisheries, and rectification of landfill and contaminated sites. The mitigation and enhancement plans carried out were the biggest for a highway project in British Columbia. The project alignment passes through Burns Bog Ecological Conservancy Area. A lawsuit was filed by the conservation society in November 2010 claiming that the project would endanger farms and wetlands in Surrey and Delta. The SFPR was built in coordination with Burns Bog Management Committee to make sure that the construction of the project was in accordance with the Burns Bog Ecological Conservancy Management Plan. SFPR is a private-public partnership (design-build-finance-operate) project. Design, build, finance and maintenance (DBFM) services were carried out by Fraser Transportation Group. It included ACS Infrastructure Canada and Ledcor Industrial/Mining Group, Dragados Canada, Ledcor CMI, Belpacific Excavating and Shoring Limited Partnership and Vancouver Pile Driving. Morrison Hershfield was the engineering consultant and Delcan was the programme manager. Hershfield and Arup were the technical advisers. The environmental review was carried by a number of consultants, including Hatfield, Gebauer & Associates and Hemmera. The agricultural assessment was done by Talisman Land Resource Consultants and Summit Environmental Consultants. Other key players involved in the project were Stantec, Trow Global, Buckland & Taylor, Urban Systems and McElhanney.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data