South Jersey Gas Company (SJG), a natural gas supplier in New Jersey, US, proposed a new 22-mile (35.4km)-long gas pipeline to transmit natural gas to the Cape May Energy Centre (formerly B.L.England generating facility) located in Beesley’s Point, Cape May County, New Jersey. The project is a part of New Jersey’s 2011 Energy Master Plan (EMP), which is aimed at reducing energy cost for customers

Project Information FAQ

Project Information

3 Q
The project “South Jersey Gas (SJG) Natural Gas Pipeline, New Jersey” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in World. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

South Jersey Gas Company (SJG), a natural gas supplier in New Jersey, US, proposed a new 22-mile (35.4km)-long gas pipeline to transmit natural gas to the Cape May Energy Centre (formerly B.L.England generating facility) located in Beesley’s Point, Cape May County, New Jersey. The project is a part of New Jersey’s 2011 Energy Master Plan (EMP), which is aimed at reducing energy cost for customers and promoting a diverse portfolio of clean in-state power generation. The pipeline project, to be constructed with an investment of $90m, received approval from the New Jersey Board of Public Utilities (NJBPU) in December 2015. It has also received approvals from the US Army Corps of Engineers and the New Jersey Department of Environmental Protection (NJDEP). The project is awaiting final approval by the Pinelands Commission. According to the 2011 Energy Master Plan, the state has to discourage the construction of new coal-fired power plants and accelerate the decommissioning of existing plants. The B.L. England station, being a coal-fired plant, has hence been given a choice to either decommission the station or to convert it into a natural gas-powered facility. RC Cape May Holdings, the power station owner, decided to repower the plant using natural gas. The proposed pipeline will supply natural gas to the coal-fired generation station, securing gas supply to it upon conversion into a natural gas-fired plant. It will also enable the achievement of a number of goals mentioned in the EMP such as the promotion of new, clean, in-state electric generation for power production and environment protection by reducing air emissions. The new pipeline will also enhance the access to safe and reliable gas supply to the customers in Atlantic and Cape May counties of Southern New Jersey. It will be interconnected with the South Jersey Gas system and hence act as a back-up supply to approximately 142,000 SJG customers, who are being served by a single pipeline and are vulnerable to service outages in event of natural disasters and accidents. The annual throughput of gas to the B.L.England generating facility will be approximately 20m dekatherms (DTH), which is equivalent to the annual gas supply by SJG to roughly 267,000 homes in the region. The pipeline will pass through Maurice River Township, Estell Manor, and Upper Township with roughly 90% running within the rights-of-way of public roads, including Highway Routes 49 and 50 and Tuckahoe Road (County Route 631), and the remaining 10% (2.2mi) set in easements across private property. Approximately 15mi of the pipeline will run under existing paved roads and will not disturb the protected areas of the Pinelands. The 24-inch diameter, high-pressure natural gas transmission line will begin at Millville in Maurice River Township and end at Beesley’s Point. Its design and construction will be according to the New Jersey pipeline regulations, which are far superior to federal regulations. It will have state-of-the-art safety features such as automatic and remotely-controlled valves. The pipeline will be built using latest construction techniques. Different construction techniques meeting the industry standards for the construction of underground utilities will be adopted. The first technique is a direct bury method, which involves opening a trench, placing the pipe and then burying it. The other two methods incorporate a trenchless technology called Jack & Bore and Horizontal Directional Drilling (HDD), which involves identifying a starting and ending point, excavating both the ends, inserting a pipe and either pushing it or pulling it from one end to the other. An interconnection station measuring 150ft-long and 150ft-wide will be constructed on a maintained lawn in the village of Tuckahoe. Approximately four miles of horizontal directional drills will be added to the project to replace open-cut trenching. The materials used for the construction are in accordance with all federal and state regulations for the construction of the natural gas pipeline.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data