logo

South Korea's First-Ever Chemical Spill Response Vessel

Sector: Oil and Gas • Location: South Korea

Source: Baird Maritime

Project
Awarded

HJ Shipbuilding and Construction has secured a KRW68.8 billion ($47.7 million) contract to build a 1,900-tonne multipurpose chemical response vessel for the Korea Coast Guard. The vessel is designed to respond to maritime chemical accidents and will be equipped with chemical analysis tools, oil recovery equipment, and towing facilities. It is 70 metres long, 14.6 metres wide, and 6.5 metres deep,

Project Information FAQ

Project Information

5 Q
The project “South Korea's First-Ever Chemical Spill Response Vessel” is an infrastructure initiative in the Oil and Gas sector, located in South Korea. Taiyo aggregates data on it from Baird Maritime.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

awarded

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

HJ Shipbuilding and Construction has secured a KRW68.8 billion ($47.7 million) contract to build a 1,900-tonne multipurpose chemical response vessel for the Korea Coast Guard. The vessel is designed to respond to maritime chemical accidents and will be equipped with chemical analysis tools, oil recovery equipment, and towing facilities. It is 70 metres long, 14.6 metres wide, and 6.5 metres deep, with a maximum speed of 15.5 knots and a cruising range of 1,600 kilometres. The ship will have towing facilities capable of assisting 30,000-tonne distressed vessels and is designed for search, rescue, and firefighting operations in sea states with waves up to four metres. It features a hazardous substance safety response system, detection and analysis system, and a firefighting capacity of 9,600 cubic metres per hour. The vessel is scheduled for deployment in 2028.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data