logo

South Lake 42 Finished Water Line Package -4

Sector: Metal • Location: Georgetown, Texas, United States of America

Source: Dodge USA

Project
Bid Results

The project consists of furnishing, installing and providing all labor and materials required for construction of approximately 17,000 LF of 42-inch ductile iron finished waterline via open trench methods, approximately 50 LF of 42-inch finished waterline in 54-inch steel casing via trenchless methods, 60-inch by 42-inch pipe connection, pressure reduction valve vaults, air valve manholes, butterf

Status
Closed
Sector
Metal, Water Supply and Storage, Steel, Government, Commercial, Waste Processing and Treatment
Location
Georgetown, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about South Lake 42 Finished Water Line Package -4

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “South Lake 42 Finished Water Line Package -4” is an infrastructure initiative in the Metal sector, located in Georgetown, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of furnishing, installing and providing all labor and materials required for construction of approximately 17,000 LF of 42-inch ductile iron finished waterline via open trench methods, approximately 50 LF of 42-inch finished waterline in 54-inch steel casing via trenchless methods, 60-inch by 42-inch pipe connection, pressure reduction valve vaults, air valve manholes, butterfly valves, drain valves, firehydrants

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Georgetown

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Water Supply and Storage, Steel, Government, Commercial, Waste Processing and Treatment

Article published date

2024-06-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project