South Mapleton Waterline Well to Tank
Sector: Water Supply and Storage • Location: Mapleton, Utah, United States of America
Source: Dodge USA
The project includes the following work: 1. Installation of 2,400 linear feet of 12 DI waterline from the Crowd Canyon culinary well to the Crowd Canyon storage tank, and 32 linear feet of 18 DI waterline near the tank. 2. Associated air valve vaults, fittings, thrust restraints, and connections to existing water mains to separate the proposed well to tank waterline from the existing culinary dist
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment
- Location
- Mapleton, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about South Mapleton Waterline Well to Tank
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the following work: 1. Installation of 2,400 linear feet of 12 DI waterline from the Crowd Canyon culinary well to the Crowd Canyon storage tank, and 32 linear feet of 18 DI waterline near the tank. 2. Associated air valve vaults, fittings, thrust restraints, and connections to existing water mains to separate the proposed well to tank waterline from the existing culinary distribution main. 3. Excavation, backfill, and restoration of the existing road base access road. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Mapleton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
