South Mission Road North Segment
Closed · California · Last reported Oct 2024
Source: Dodge USA
Consists in general of installing water quality treatment systems. The project will also include, but not limited to RCP storm drain pipes and culverts, storm drain cleanouts, PCC curb, gutter and sidewalk, PCC curb ramp, trash capture system, biofiltration basin, plane asphalt, placing AC, traffic signing and striping, and traffic control.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Road, Government, Car parking, Waste Processing and Treatment, Automotive
- Location
- Fallbrook, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about South Mission Road North Segment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Consists in general of installing water quality treatment systems. The project will also include, but not limited to RCP storm drain pipes and culverts, storm drain cleanouts, PCC curb, gutter and sidewalk, PCC curb ramp, trash capture system, biofiltration basin, plane asphalt, placing AC, traffic signing and striping, and traffic control. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fallbrook |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Government, Car parking, Waste Processing and Treatment, Automotive |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
