logo
ProjectFully Disbursed

South North Water Conveyor

Sector: Water Supply and Storage • Location: Jordan

Source: European Investment Bank (EIB)

The purpose of the project is to build, operate and transfer a water extraction and conveyance system to supply through a 325 km pipeline mainly the Greater Amman area with 100 million cubic metres per year of potable water.

Status
Closed
Sector
Water Supply and Storage
Location
Jordan
Updated
22 Jul 2026
Source
European Investment Bank (EIB)

ConstructChat

Ask ConstructChat about South North Water Conveyor

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “South North Water Conveyor” is an infrastructure initiative in the Water Supply and Storage sector, located in Jordan. Taiyo aggregates data on it from European Investment Bank (EIB).

Participants

Not available for this record.

Status

Original status

fully disbursed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The purpose of the project is to build, operate and transfer a water extraction and conveyance system to supply through a 325 km pipeline mainly the Greater Amman area with 100 million cubic metres per year of potable water.

Original sector

Water, sewerage

Location

Country

Jordan

Source

Source

European Investment Bank (EIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project