South Orient Rail Line Rehabilitation
Sector: Forest Products and Packaging • Location: United States of America
Source: Grants.gov
This project is the final phase of the South Orient Rail Line Rehabilitation to improve track conditions from Excepted Track to Class 2, track between San Angelo Junction (Coleman County) through Runnels County, to the west side of San Angelo, Texas in Tom Green County, a distance of approximately 82 miles.The project work will include the replacement of two structurally deficient timber rail brid
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | archived |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project is the final phase of the South Orient Rail Line Rehabilitation to improve track conditions from Excepted Track to Class 2, track between San Angelo Junction (Coleman County) through Runnels County, to the west side of San Angelo, Texas in Tom Green County, a distance of approximately 82 miles.The project work will include the replacement of two structurally deficient timber rail bridges, repair and rehabilitation of an additional 29 timber rail bridges, the replacement or repair of two defective wooden-box culverts, and the construction of a drainage ditch with rip-rap lining. Existing continuously welded rail (CWR) will be extended to replace jointed rail from within 13 curves, through the spiral and into tangent track and defective jointed rail will be replaced with CWR in another curve. Worn and broken switch points and turnout components will be replaced or welded and re-profiled as necessary as part of the project improvements. Highway-rail grade crossing signal timing will be adjusted at eight locations to allow increased train speeds over those crossings. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
