logo

South Orient Rail Line Rehabilitation

Sector: Forest Products and Packaging • Location: United States of America

Source: Grants.gov

Project
Archived

This project is the final phase of the South Orient Rail Line Rehabilitation to improve track conditions from Excepted Track to Class 2, track between San Angelo Junction (Coleman County) through Runnels County, to the west side of San Angelo, Texas in Tom Green County, a distance of approximately 82 miles.The project work will include the replacement of two structurally deficient timber rail brid

Project Information FAQ

Project Information

4 Q
The project “South Orient Rail Line Rehabilitation” is an infrastructure initiative in the Forest Products and Packaging sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is the final phase of the South Orient Rail Line Rehabilitation to improve track conditions from Excepted Track to Class 2, track between San Angelo Junction (Coleman County) through Runnels County, to the west side of San Angelo, Texas in Tom Green County, a distance of approximately 82 miles.The project work will include the replacement of two structurally deficient timber rail bridges, repair and rehabilitation of an additional 29 timber rail bridges, the replacement or repair of two defective wooden-box culverts, and the construction of a drainage ditch with rip-rap lining. Existing continuously welded rail (CWR) will be extended to replace jointed rail from within 13 curves, through the spiral and into tangent track and defective jointed rail will be replaced with CWR in another curve. Worn and broken switch points and turnout components will be replaced or welded and re-profiled as necessary as part of the project improvements. Highway-rail grade crossing signal timing will be adjusted at eight locations to allow increased train speeds over those crossings.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data