South Pittsburg H S New Greenhouse Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
New Greenhouse (approximately 680 SF) consisting of: a. Offset shed roof, clerestory, single room building. b. Double walled polyethylene greenhouse glazing and associated accessories. c. Steel and expanded polystyrene stressed skin roof and wall panels. d. Hand wash sink. e. All new work includes finishes, mechanical, electrical, etc, as depicted on drawings. f. Structure is primarily metal frame
- Status
- Closed
- Sector
- Raw Materials, Power Generation (CCGT), Chemical (Industrial), Manufacturing (Industrial), Commercial, Car parking, Automotive, Steel, Cement, Metal, Education, Government
- Location
- South Pittsburg, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about South Pittsburg H S New Greenhouse Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New Greenhouse (approximately 680 SF) consisting of: a. Offset shed roof, clerestory, single room building. b. Double walled polyethylene greenhouse glazing and associated accessories. c. Steel and expanded polystyrene stressed skin roof and wall panels. d. Hand wash sink. e. All new work includes finishes, mechanical, electrical, etc, as depicted on drawings. f. Structure is primarily metal frame and turned down concrete slab. g. Hollow metal doors and frame. Sitework: a. New paving/ parking... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | South Pittsburg |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Power Generation (CCGT), Chemical (Industrial), Manufacturing (Industrial), Commercial, Car parking, Automotive, Steel, Cement, Metal, Education, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
