logo

SOUTH RIVER TRAIL EXT FROM BOLDER WALK DRIVE TO CRESTDALE RD

Sector: Power Generation (CCGT) • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The project limits for the South River Trail Extension Project Phase 6 are from near Boulder Walk Drive and Intrenchment Creek to Crestdale Circle (DK-455, GDOT PI 0017809). A preliminary concept report was completed under PI 0015065 and is included as an attachment to this RFQ. The trail is proposed to cross over Intrenchment Creek to property owned by the City of Atlanta. The trail continues to

Status
Under Construction
Sector
Power Generation (CCGT), Residential, Bridge, Road, Power Transmission
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SOUTH RIVER TRAIL EXT FROM BOLDER WALK DRIVE TO CRESTDALE RD

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SOUTH RIVER TRAIL EXT FROM BOLDER WALK DRIVE TO CRESTDALE RD” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project limits for the South River Trail Extension Project Phase 6 are from near Boulder Walk Drive and Intrenchment Creek to Crestdale Circle (DK-455, GDOT PI 0017809). A preliminary concept report was completed under PI 0015065 and is included as an attachment to this RFQ. The trail is proposed to cross over Intrenchment Creek to property owned by the City of Atlanta. The trail continues to Key Road for an enhanced grade crossing. The trail is proposed to bridge Intrenchment Creek, then run along the northern side of Key Road running parallel to the Georgia Power utility cut. This phase of the trail will continue along the edge of the residential areas and terminate at Crestdale Circle.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Residential, Bridge, Road, Power Transmission

Article published date

2026-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project