SOUTH RIVER TRAIL EXT FROM BOLDER WALK DRIVE TO CRESTDALE RD
Sector: Power Generation (CCGT) • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The project limits for the South River Trail Extension Project Phase 6 are from near Boulder Walk Drive and Intrenchment Creek to Crestdale Circle (DK-455, GDOT PI 0017809). A preliminary concept report was completed under PI 0015065 and is included as an attachment to this RFQ. The trail is proposed to cross over Intrenchment Creek to property owned by the City of Atlanta. The trail continues to
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Residential, Bridge, Road, Power Transmission
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SOUTH RIVER TRAIL EXT FROM BOLDER WALK DRIVE TO CRESTDALE RD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project limits for the South River Trail Extension Project Phase 6 are from near Boulder Walk Drive and Intrenchment Creek to Crestdale Circle (DK-455, GDOT PI 0017809). A preliminary concept report was completed under PI 0015065 and is included as an attachment to this RFQ. The trail is proposed to cross over Intrenchment Creek to property owned by the City of Atlanta. The trail continues to Key Road for an enhanced grade crossing. The trail is proposed to bridge Intrenchment Creek, then run along the northern side of Key Road running parallel to the Georgia Power utility cut. This phase of the trail will continue along the edge of the residential areas and terminate at Crestdale Circle. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Residential, Bridge, Road, Power Transmission |
Article published date | 2026-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
