logo
ProjectPre-Design

South Road Culvert Replacement

One of 8,613 projects Taiyo tracks in New Hampshire.

Source: Dodge USA

This South Road culvert is located between West Road and the North Hampton Town line, and is a combination of a stone culvert and 18" diameter reinforced concrete culvert. Its physical condition is poor. It has a high hazard potential and is subject to flooding, and a significant resource value. It is rated as the highest in the town-wide major stormwater crossing replacement study. Its culvert de

Status
Prospective
Sector
Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Commercial
Location
Rye, New Hampshire, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about South Road Culvert Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “South Road Culvert Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Rye, New Hampshire, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

This South Road culvert is located between West Road and the North Hampton Town line, and is a combination of a stone culvert and 18" diameter reinforced concrete culvert. Its physical condition is poor. It has a high hazard potential and is subject to flooding, and a significant resource value. It is rated as the highest in the town-wide major stormwater crossing replacement study. Its culvert designation in the culvert report is BAB-13-P101

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Rye

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project