South Road Tunnel Project
Sector: Tunnel • Location: Adelaide, South Australia, Australia
Source: Trenchless Australasia
A $15.4 billion infrastructure project in South Australia involving the use of three large-scale tunnel boring machines (TBMs) to construct a 4.5 kilometre tunnel from Clovelly Park to Anzac Highway. The project aims to allow motorists to bypass 21 sets of traffic lights, saving up to 40 minutes of travel time during peak hours. The TBMs are named after prominent South Australian suffragists and w
- Status
- Under Construction
- Sector
- Tunnel
- Location
- Adelaide, South Australia, Australia
- Updated
- 22 Jul 2026
- Source
- Trenchless Australasia
ConstructChat
Ask ConstructChat about South Road Tunnel Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $15.4 billion infrastructure project in South Australia involving the use of three large-scale tunnel boring machines (TBMs) to construct a 4.5 kilometre tunnel from Clovelly Park to Anzac Highway. The project aims to allow motorists to bypass 21 sets of traffic lights, saving up to 40 minutes of travel time during peak hours. The TBMs are named after prominent South Australian suffragists and will operate 24/7 for up to 24 months. |
Original sector | Infrastructure |
Budget |
Location
Country | Australia |
State | South Australia |
City | Adelaide |
Source
Source | Trenchless Australasia |
URL |
More Details
Record type | Project |
Sector | Tunnel |
Article published date | 2026-05-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
