logo
ProjectPre-Design

South Sequim Complete Streets Connect Improvements

Sector: Road • Location: Sequim, Washington, United States of America

Source: Dodge USA

Once complete, the South Sequim Complete Streets project, will directly connect our two Economic Opportunity Areas (EOAs), from the west side to the east side of the downtown area.

Status
Prospective
Sector
Road, Government, Manufacturing (Industrial), Commercial
Location
Sequim, Washington, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about South Sequim Complete Streets Connect Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “South Sequim Complete Streets Connect Improvements” is an infrastructure initiative in the Road sector, located in Sequim, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Once complete, the South Sequim Complete Streets project, will directly connect our two Economic Opportunity Areas (EOAs), from the west side to the east side of the downtown area.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Sequim

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Government, Manufacturing (Industrial), Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project