logo
ProjectClosed

South Side Development Phase 1

Closed · Colorado · Last reported Feb 2025

Source: Dodge

New airfield pavements south of Runway 9-27 including new Taxiway B3 connector and new parking apron (approx. 5,769 Tons). Airfield lighting and signage along new Taxiway B3 connector and apron taxilane, and apron reflectors. New airfield pavement markings (Approx. 2,612 SF). Significant earthwork (cut and fill), taxiway/taxilane edge drains, and site storm drainage. Riprap and gabion baskets alon

Status
Closed
Sector
Government, Airport, Manufacturing (Industrial), Car parking, Commercial, Road, Automotive, Waste Processing and Treatment
Location
Telluride, Colorado, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about South Side Development Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “South Side Development Phase 1” is an infrastructure initiative in the Government sector, located in Telluride, Colorado, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

New airfield pavements south of Runway 9-27 including new Taxiway B3 connector and new parking apron (approx. 5,769 Tons). Airfield lighting and signage along new Taxiway B3 connector and apron taxilane, and apron reflectors. New airfield pavement markings (Approx. 2,612 SF). Significant earthwork (cut and fill), taxiway/taxilane edge drains, and site storm drainage. Riprap and gabion baskets along the north apron edge Taxilane B. Relocation of portions of the existing gravel airport service ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Telluride

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Airport, Manufacturing (Industrial), Car parking, Commercial, Road, Automotive, Waste Processing and Treatment

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project