South Side Development Phase 1
Sector: Manufacturing (Industrial) • Location: Telluride, Colorado, United States of America
Source: Dodge
New airfield pavements south of Runway 9-27 including new Taxiway B3 connector and new parking apron (approx. 5,769 Tons). Airfield lighting and signage along new Taxiway B3 connector and apron taxilane, and apron reflectors. New airfield pavement markings (Approx. 2,612 SF). Significant earthwork (cut and fill), taxiway/taxilane edge drains, and site storm drainage. Riprap and gabion baskets alon
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Government, Airport, Commercial, Car parking, Automotive, Waste Processing and Treatment
- Location
- Telluride, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about South Side Development Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New airfield pavements south of Runway 9-27 including new Taxiway B3 connector and new parking apron (approx. 5,769 Tons). Airfield lighting and signage along new Taxiway B3 connector and apron taxilane, and apron reflectors. New airfield pavement markings (Approx. 2,612 SF). Significant earthwork (cut and fill), taxiway/taxilane edge drains, and site storm drainage. Riprap and gabion baskets along the north apron edge Taxilane B. Relocation of portions of the existing gravel airport service ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Telluride |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Government, Airport, Commercial, Car parking, Automotive, Waste Processing and Treatment |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
