South Station Air Rights Development Project, Boston, Massachusetts
Sector: Car parking • Location: Massachusetts, United States of America
Source: Federal Highway Administration (FHWA)
The South Station Air Rights Project in Boston, Massachusetts, is a multi-phase and mixed-use development project will complete the South Station Transportation Center that features updated rail and bus terminals, office space, and residential space. The South Station is used by over 150,000 commuters daily, providing access to bus terminals and railways. The project collaborates between the
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The South Station Air Rights Project in Boston, Massachusetts, is a multi-phase and mixed-use development project will complete the South Station Transportation Center that features updated rail and bus terminals, office space, and residential space. The South Station is used by over 150,000 commuters daily, providing access to bus terminals and railways. The project collaborates between the Boston Planning and Development Agency, Hines, and the Massachusetts Bay Transportation Authority (MBTA). The project broke ground in January 2020 and is expected to be completed in June 2024 with a multi-phase approach. The project will increase the capacity of bus terminals by 50 percent while providing riders a more convenient, comfortable, and weather-protected intermodal connection when transferring from busses and parking to trains or subways. Currently, the South Station enhancements are also being made to wayfinding and safety for patrons with disabilities. Along with the upgrades, a new mixed-use tower will add 700,000 square feet of office space and 166 residential units. The updates in railyard infrastructure improvements enhance the safety of patrons while reducing the operating maintenance costs of MBTA. In addition, these improvements come with an additional recurring income to the MBTA through bus gate fees and retail revenue. The tower's construction and completion of the South Station Transportation Center and the construction of the South Station Tower is part of Phase 1 (January 2020 - June 2020). Phase 1 consists of a 51-story, 677-foot tall tower with residential and retail space. 175 residential condominiums will be located above 704,000 square-feet of office space and 7,000 square-feet of ground-floor retail. The Phase 1 also includes the creation of 530 parking spaces and the construction of the second phase of the South Station bus terminal. Two additional phases will follow: Phase 2 (July 2020 - June 2022) is approved as a residential and hotel building above the bus terminal expansion. Phase 2 will involve constructing a building comprised of residential and/or hotel units above the bus terminal expansion, covering an area of 440,000ft and including 368 parking spaces. The building will be 17-story, 334-foot tall and will include either a mix of hotel and residential space, 360 hotel rooms, 260 condominiums or 375 rental units. The Phase 3 (July 2022 - June 2024) development plan is 510,000 square feet of office and amenity space above the existing bus terminal. It will consist of a 9-story, 249-foot tall building with office space and 12,000 square-feet of ground-floor retail. The three buildings will be connected by a sky lobby serving as a passageway. The space will host public art and include amenities such as professional check-in services, public areas, and food and retail options. All phases will result in over 1,980,000 square feet of mixed-use space and 895 additional parking spaces. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
