logo

South Sudan - Juba Power Distribution System Rehabilitation and Expansion Project

Sector: Commercial • Location: South Sudan

Source: African Development Bank (AfDB)

Project

The Power Distribution and Rehabilitation Project (PDSRE) aims to strengthen distribution networks in Juba to ensure a reliable electricity supply from existing and future generation facilities. It was initiated because of the low level of electricity production, combined with inefficient distribution networks in the Juba region. It is a project that also aims to compensate for the lost load and t

Project Information FAQ

Project Information

4 Q
The project “South Sudan - Juba Power Distribution System Rehabilitation and Expansion Project” is an infrastructure initiative in the Commercial sector, located in South Sudan. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Power Distribution and Rehabilitation Project (PDSRE) aims to strengthen distribution networks in Juba to ensure a reliable electricity supply from existing and future generation facilities. It was initiated because of the low level of electricity production, combined with inefficient distribution networks in the Juba region. It is a project that also aims to compensate for the lost load and to respond to increased demand in the city. Improving and strengthening the electricity supply will help improve the quality of service provided by the national electricity company and the quality of life of the residents, as well as facilitate business activity, thereby contributing to growth economic and poverty reduction in South Sudan. The total estimated cost of the project, initially of UA 17.80 million, has been revised upward in view of its shortfall. The project includes: (i) the construction of 145 km of 33 kV lines; (ii) the construction of 370 km of 415/230 volt lines; (iii) the construction of subscriber lines to connect 20,000 new customers; (iv) the purchase and installation of 195 33 / 0.415 kV transformers; and (v) the purchase and installation of 20,000 prepaid meters for newly connected customers.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data