South Sudan - Juba Power Distribution System Rehabilitation and Expansion Project
Sector: Commercial • Location: South Sudan
Source: African Development Bank (AfDB)
The Power Distribution and Rehabilitation Project (PDSRE) aims to strengthen distribution networks in Juba to ensure a reliable electricity supply from existing and future generation facilities. It was initiated because of the low level of electricity production, combined with inefficient distribution networks in the Juba region. It is a project that also aims to compensate for the lost load and t
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Power Distribution and Rehabilitation Project (PDSRE) aims to strengthen distribution networks in Juba to ensure a reliable electricity supply from existing and future generation facilities. It was initiated because of the low level of electricity production, combined with inefficient distribution networks in the Juba region. It is a project that also aims to compensate for the lost load and to respond to increased demand in the city. Improving and strengthening the electricity supply will help improve the quality of service provided by the national electricity company and the quality of life of the residents, as well as facilitate business activity, thereby contributing to growth economic and poverty reduction in South Sudan. The total estimated cost of the project, initially of UA 17.80 million, has been revised upward in view of its shortfall. The project includes: (i) the construction of 145 km of 33 kV lines; (ii) the construction of 370 km of 415/230 volt lines; (iii) the construction of subscriber lines to connect 20,000 new customers; (iv) the purchase and installation of 195 33 / 0.415 kV transformers; and (v) the purchase and installation of 20,000 prepaid meters for newly connected customers. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
