South Tarawa Renewable Energy Project (Phase 2)
Sector: Solar • Location: Kiribati
Source: Asian Development Bank (ADB)
The proposed project will initiate and contribute to the transformation of the Kiribati energy sector to one that is low-carbon and adapted to growing climate and natural hazards. It will do this by installing the innovative, climate-adapted and efficient floating PV (FPV) for power generation and for services and benefits beyond electricity.The project will indicatively install 4 megawatts (MW) F
- Status
- Prospective
- Sector
- Solar, Water Supply and Storage, Energy Storage, Residential, Biomass, Electric Vehicles (EVs), Oil and Gas, Automotive, Power Generation (CCGT), Commercial, Government, Education, Aerospace & Defense
- Location
- Kiribati
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about South Tarawa Renewable Energy Project (Phase 2)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will initiate and contribute to the transformation of the Kiribati energy sector to one that is low-carbon and adapted to growing climate and natural hazards. It will do this by installing the innovative, climate-adapted and efficient floating PV (FPV) for power generation and for services and benefits beyond electricity.The project will indicatively install 4 megawatts (MW) FPV in Betio, 3 megavolt-ampere (MVA) /3 megawatt-hour (MWh) BESS in Bonriki, and at least 30 km of 33 kilovolt (kV) overhead and underground transmission and distribution network from Bonriki to Bikenibeu, then to Betio, including all related grid integration and control systems. The FPV system will be designed to integrate priority sustainable value-added end-uses to maximize the use of daytime solar energy. The project will also indicatively install productive uses of energy infrastructure such as (i) electric vehicles, e-boat and charging station, and (ii) electric reef regeneration and other coastal protection and disaster risk reduction measures. The project will also include institutional capacity strengthening. |
Original sector | Energy |
Budget |
Location
Country | Kiribati |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Solar, Water Supply and Storage, Energy Storage, Residential, Biomass, Electric Vehicles (EVs), Oil and Gas, Automotive, Power Generation (CCGT), Commercial, Government, Education, Aerospace & Defense |
Article published date | 2024-12-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
