logo
ProjectApproved

South Tarawa Renewable Energy Project (Phase 2)

Sector: Solar • Location: Kiribati

Source: Asian Development Bank (ADB)

The proposed project will initiate and contribute to the transformation of the Kiribati energy sector to one that is low-carbon and adapted to growing climate and natural hazards. It will do this by installing the innovative, climate-adapted and efficient floating PV (FPV) for power generation and for services and benefits beyond electricity.The project will indicatively install 4 megawatts (MW) F

Status
Prospective
Sector
Solar, Water Supply and Storage, Energy Storage, Residential, Biomass, Electric Vehicles (EVs), Oil and Gas, Automotive, Power Generation (CCGT), Commercial, Government, Education, Aerospace & Defense
Location
Kiribati
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about South Tarawa Renewable Energy Project (Phase 2)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “South Tarawa Renewable Energy Project (Phase 2)” is an infrastructure initiative in the Solar sector, located in Kiribati. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Status

Original status

Approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project will initiate and contribute to the transformation of the Kiribati energy sector to one that is low-carbon and adapted to growing climate and natural hazards. It will do this by installing the innovative, climate-adapted and efficient floating PV (FPV) for power generation and for services and benefits beyond electricity.The project will indicatively install 4 megawatts (MW) FPV in Betio, 3 megavolt-ampere (MVA) /3 megawatt-hour (MWh) BESS in Bonriki, and at least 30 km of 33 kilovolt (kV) overhead and underground transmission and distribution network from Bonriki to Bikenibeu, then to Betio, including all related grid integration and control systems. The FPV system will be designed to integrate priority sustainable value-added end-uses to maximize the use of daytime solar energy. The project will also indicatively install productive uses of energy infrastructure such as (i) electric vehicles, e-boat and charging station, and (ii) electric reef regeneration and other coastal protection and disaster risk reduction measures. The project will also include institutional capacity strengthening.

Original sector

Energy

Budget

Location

Country

Kiribati

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Solar, Water Supply and Storage, Energy Storage, Residential, Biomass, Electric Vehicles (EVs), Oil and Gas, Automotive, Power Generation (CCGT), Commercial, Government, Education, Aerospace & Defense

Article published date

2024-12-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project