South Temple Upsizing
Sector: Water Supply and Storage • Location: Salt Lake City, Utah, United States of America
Source: Dodge USA
he work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: TRENCHLESS REHABILITATION OF THE EXISTING SEWER ALONG THE NORTH SIDE OF SOUTH TEMPLE. WORK INCLUDES UPSIZING THE EXISTING 12 VCP/CIPP SANITARY SEWER ALONG SOUTH TEMPLE FROM 700 E
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Manufacturing (Industrial), Commercial, Waste Processing and Treatment
- Location
- Salt Lake City, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about South Temple Upsizing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | he work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: TRENCHLESS REHABILITATION OF THE EXISTING SEWER ALONG THE NORTH SIDE OF SOUTH TEMPLE. WORK INCLUDES UPSIZING THE EXISTING 12 VCP/CIPP SANITARY SEWER ALONG SOUTH TEMPLE FROM 700 E TO 800 E TO 16 HDPE VIA PIPE BURST, UPSIZING THE EXISTING 8 VCP/CIPP SANITARY SEWER ALONG SOUTH T... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Salt Lake City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Manufacturing (Industrial), Commercial, Waste Processing and Treatment |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
