South Terminal Apron Rehabilitation
Sector: Airport • Location: Santa Barbara, California, United States of America
Source: Dodge
The South Terminal Apron Rehabilitation involves the rehabilitation of approximately 33,427 square yards of Portland cement concrete at the southernmost portion of the airline terminal apron. The existing Portland cement concrete was installed by the military in approximately 1945 and is in need of rehabilitation.
- Status
- Prospective
- Sector
- Airport, Manufacturing (Industrial), Commercial, Cement, Government
- Location
- Santa Barbara, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about South Terminal Apron Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The South Terminal Apron Rehabilitation involves the rehabilitation of approximately 33,427 square yards of Portland cement concrete at the southernmost portion of the airline terminal apron. The existing Portland cement concrete was installed by the military in approximately 1945 and is in need of rehabilitation. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Barbara |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Airport, Manufacturing (Industrial), Commercial, Cement, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in United States of America
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- AIRPORT ROAD IN VIDALIA - TIA
- ATLANTA-CCO - CRRSA
- DAWSON - CARES ACT
- PROJECT ADMINISTRATION - FAA-3-13-SBGP-04-2009 - FY09 DISCR
- McRAE-ENVIRON. ASSMT. FOR PARALLEL TAXIWAY AREA IMPROVMENT
- REIDSVILLE- FUEL FACILITY CARD READER AND DESIGN OF RUNWAY
