logo

South Tyger River Greenway Trail - Phase 1A

Sector: Mass Transit • Location: Greer, South Carolina, United States of America

Source: Dodge

Project
Bidding

This project consists of Phase 1A of the South Tyger River Greenway, which is part of a master plan that was developed in 2022. This portion of the trail will provide a much-needed walking amenity to our existing Country Club Road Park, and exposure to nature along the South Tyger River that citizens have not been afforded before. The trail will be 3,760 linear feet long and 12 feet wide, with 4 r

Status
Prospective
Sector
Mass Transit, Road, Government, Rail, Car parking, Commercial, Automotive
Location
Greer, South Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about South Tyger River Greenway Trail - Phase 1A

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “South Tyger River Greenway Trail - Phase 1A” is an infrastructure initiative in the Mass Transit sector, located in Greer, South Carolina, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of Phase 1A of the South Tyger River Greenway, which is part of a master plan that was developed in 2022. This portion of the trail will provide a much-needed walking amenity to our existing Country Club Road Park, and exposure to nature along the South Tyger River that citizens have not been afforded before. The trail will be 3,760 linear feet long and 12 feet wide, with 4 river overlooks. It will meet ADA requirements as outlined in the US Forest Service Trail Accessib...

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

Greer

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Mass Transit, Road, Government, Rail, Car parking, Commercial, Automotive

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project