South Uchi Project Spring Drill Program
One of 10,000+ projects Taiyo tracks in Ontario.
Source: The Globe and Mail
The 2026 spring drill program at the South Uchi Project in the Red Lake District of Ontario involved six diamond drill holes totaling 3,187 metres. The program followed the identification of a new gold-bearing structural corridor and aimed to test strike extensions of mineralisation beneath deep glacial cover. The project includes maintaining camp and infrastructure at Papaonga for a potential sub
- Status
- Closed
- Sector
- Mining
- Location
- Red Lake, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- The Globe and Mail
ConstructChat
Ask ConstructChat about South Uchi Project Spring Drill Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 2026 spring drill program at the South Uchi Project in the Red Lake District of Ontario involved six diamond drill holes totaling 3,187 metres. The program followed the identification of a new gold-bearing structural corridor and aimed to test strike extensions of mineralisation beneath deep glacial cover. The project includes maintaining camp and infrastructure at Papaonga for a potential subsequent drill program planned for summer 2026. |
Original sector | Mining |
Location
Country | Canada |
State | Ontario |
City | Red Lake |
Source
Source | The Globe and Mail |
URL |
More Details
Record type | Project |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
