South Van Dorn Street Bicycle & Pedestrian Access REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Scope - The project will construct a new shared use path along the east side of South Van Dorn Street, from south of Oakwood Road to the Capital Beltway (I-95/495) overpass, and includes realignment of the existing I-95/495 on-ramp and right turn lane at Oakwood Road to provide a signalized pedestrian crossing. The scope of work also includes, but is not limited to approximately 1900 LF, 10 ft wid
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Mass Transit, Automotive, Rail, Government, Commercial
- Location
- Centreville, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about South Van Dorn Street Bicycle & Pedestrian Access REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The project will construct a new shared use path along the east side of South Van Dorn Street, from south of Oakwood Road to the Capital Beltway (I-95/495) overpass, and includes realignment of the existing I-95/495 on-ramp and right turn lane at Oakwood Road to provide a signalized pedestrian crossing. The scope of work also includes, but is not limited to approximately 1900 LF, 10 ft wide asphalt trail, concrete sidewalk, concrete bus stop pads, curb and combination curb and gutter,... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Centreville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Mass Transit, Automotive, Rail, Government, Commercial |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
