South Water Tower Construction
Sector: Water Supply and Storage • Location: Grinnell, Iowa, United States of America
Source: Dodge USA
Construct South Water Tower including all labor, materials, and equipment necessary to construct a 1,000,000 gallon composite water tower including excavation, backfill and site work, foundation, PCC pavement, buried piping and valves, painting, electrical wiring and conduit, controls integration, lighting, miscellaneous equipment, site grading, surface restoration and miscellaneous associated wor
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment
- Location
- Grinnell, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about South Water Tower Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construct South Water Tower including all labor, materials, and equipment necessary to construct a 1,000,000 gallon composite water tower including excavation, backfill and site work, foundation, PCC pavement, buried piping and valves, painting, electrical wiring and conduit, controls integration, lighting, miscellaneous equipment, site grading, surface restoration and miscellaneous associated work, including cleanup. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Grinnell |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
