South West Arkansas Lithium Project
Planned · Arkansas · Last reported Dec 2025
Source: Magnolia Banner News
The South West Arkansas Project is a direct lithium extraction project in southwest Arkansas and East Texas, developed by Smackover Lithium, a joint venture between Standard Lithium Ltd. and Equinor. The project aims to start lithium production in 2028 and create 100 to 125 jobs initially. The first phase of construction is valued at $1.45 billion and is seeking up to $1.1 billion in debt financin
- Status
- Prospective
- Sector
- Energy
- Location
- Smackover, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Magnolia Banner News
ConstructChat
Ask ConstructChat about South West Arkansas Lithium Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The South West Arkansas Project is a direct lithium extraction project in southwest Arkansas and East Texas, developed by Smackover Lithium, a joint venture between Standard Lithium Ltd. and Equinor. The project aims to start lithium production in 2028 and create 100 to 125 jobs initially. The first phase of construction is valued at $1.45 billion and is seeking up to $1.1 billion in debt financing. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Smackover |
Source
Source | Magnolia Banner News |
URL |
More Details
Record type | Project |
Article published date | 2025-12-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
