South West Arkansas (SWA) Phase 1 Lithium Brine Extraction Project
Sector: Energy • Location: Lewisville, Arkansas, United States
Source: FOX40
Smackover Lithium, a joint venture between Standard Lithium Ltd. and Equinor, has completed sampling from the Lester well in the SWA Project area, reporting the highest lithium brine grade to date. The project is advancing through FEED and Definitive Feasibility Studies, targeting a Final Investment Decision by year-end 2025.
- Status
- Prospective
- Sector
- Energy
- Location
- Lewisville, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- FOX40
ConstructChat
Ask ConstructChat about South West Arkansas (SWA) Phase 1 Lithium Brine Extraction Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | feed studies nearing completion |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Smackover Lithium, a joint venture between Standard Lithium Ltd. and Equinor, has completed sampling from the Lester well in the SWA Project area, reporting the highest lithium brine grade to date. The project is advancing through FEED and Definitive Feasibility Studies, targeting a Final Investment Decision by year-end 2025. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Lewisville |
Source
Source | FOX40 |
URL |
More Details
Record type | Project |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
