logo

South-West Gissar Project

Sector: Cement • Location: Uzbekistan

Source: Hydrocarbon Technology

Project
Closed

South-West Gissar project is located in the Kashkadarya region of Uzbekistan. Image courtesy of Lukoil. First production from the Gissar project was achieved in 2011. Image courtesy of Lukoil. The South-West Gissar project includes seven oil and gas fields. Image courtesy of Lukoil. Full field development at the project was launched in 2014. Image courtesy of Lukoil. New processing and infrastruct

Project Information FAQ

Project Information

4 Q
The project “South-West Gissar Project” is an infrastructure initiative in the Cement sector, located in Uzbekistan. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

South-West Gissar project is located in the Kashkadarya region of Uzbekistan. Image courtesy of Lukoil. First production from the Gissar project was achieved in 2011. Image courtesy of Lukoil. The South-West Gissar project includes seven oil and gas fields. Image courtesy of Lukoil. Full field development at the project was launched in 2014. Image courtesy of Lukoil. New processing and infrastructure facilities were launched at the South-west Gissar project in 2017. Image courtesy of Lukoil. The South-West Gissar project comprises the development of seven oil and gas fields in the Kashkadarya region of Uzbekistan. The site’s full development was achieved in September 2017, boosting the production rate to five billion cubic metres (bcm) a year. A total of 3,500 workers and 250 employees were required to complete the facilities, as well as more than 350 pieces of equipment. Lukoil subsidiary Lukoil Uzbekistan Operating Company is the owner and operator of the project. Gissar is one of two projects currently being operated by Lukoil in Uzbekistan, the second being the Kandym-Khauzak-Shady project. The assets related to the South-West Gissar project were acquired by Lukoil from SNG Holdings. Lukoil signed a production sharing agreement (PSA) with the government holding company Uzbekneftegaz in January 2007 for a period of 36 years. The project consists of the gas condensate fields Dzharkuduk-Yangi Kyzylcha, Gumbulak, Amanata, Pachkamar and Adamtash, in addition to the Southern Kyzylbayrak oil and gas condensate field and the Koshkuduk oil field. Additionally, the PSA covers the Southern Kyzylbayrak and Koshkuduk fields. It also permits exploration and development in the contract area. The oil and gas-in-place (C1) of the project are estimated to be 100 billion cubic metres of gas and approximately six million tonnes of liquid hydrocarbons (oil and gas condensate). First gas production from the project’s early phase development was achieved from the Dzharkuduk-Yangi Kyzylcha field in late-2011. New production wells and power supply lines, an oil gathering and a treatment system were also developed during the phase, as well as several access roads. The project moved into the execution phase in 2013, which saw the development of the Adamtash and Gumbulak fields. The Dzhakurduk gas treatment plant featuring a capacity of 4.4 billion cubic metres per year, and the Adamtash preliminary gas plant with a capacity of 1.8 billion cubic metres per year, were also built during the executive phase. In addition, a gas gathering system, power supply system and network of motor roads were developed. Lukoil commenced planning for the full development phase of the project in 2014. Additional motor roads, a substation and power lines were constructed during this period. Furthmore, two wells at the Dzharkuduk field were put in operation. A total of 13 wells were in production at the field by the end of 2015. New production and operational facilities were commissioned at the Gissar project in September 2017 as part of the final stage of full field development. The facilities included a 4.4 billion cubic metre gas processing plant, a gas pre-treatment unit and six gas gathering stations. In addition, 300km of power lines, two substations and 126km of roads were developed. The project required the use of 64,000m³ of concrete, 12,000t of steel structures and 4,000t of equipment. In addition, 286km of linear pipelines were laid. A total of 37 production wells are currently operational at the site. The final stage of the full field development was executed via a $500m loan secured by Lukoil from a consortium of banks, including Intesa Sanpaolo Bank Luxembourg S, Natixis, Mizuho Bank, UniCredit, VTB Bank, ING Bank, AO Raiffeisenbank and Raiffeisen Bank International. Oil produced from the field is transported to the Bukhara and Fergana refineries via the Shurtan terminal, while raw stock is processed by UDP Shurtanneftgaz. Produced gas is exported to Russia, Kazakhstan and China. ERIELL Group was awarded the design and construction contract for the full development phase of the project. GE was subcontracted by ERIELL to supply centrifugal compressors, while Flenco supplied auxiliary systems.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data