logo

South-West Moscow drinking water plant

Sector: Government • Location: Russian Federation

Source: World Bank Group

Project
Active

In December 2003, the local government of Moscow, Russia, through its water operator Mosvodokanal, awarded a 13.5 year build, own, operate and transfer (BOOT) contract for a potable water plant in South-West Moscow to German WTE Wassertechnik GmbH (WTE). WTE became responsible for the design, financing, construction and operation of the water treatment plant. The plant was expected to cost Euro 19

Status
Prospective
Sector
Government, Water Supply and Storage, Warehouse, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Commercial
Location
Russia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about South-West Moscow drinking water plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “South-West Moscow drinking water plant” is an infrastructure initiative in the Government sector, located in Russian Federation. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In December 2003, the local government of Moscow, Russia, through its water operator Mosvodokanal, awarded a 13.5 year build, own, operate and transfer (BOOT) contract for a potable water plant in South-West Moscow to German WTE Wassertechnik GmbH (WTE). WTE became responsible for the design, financing, construction and operation of the water treatment plant. The plant was expected to cost Euro 190 million (US$ 220.78 million) and was designed to produce 250,000 cubic meters of water per day. The plant would supply drinking water to one million people. WTE Wassertechnik GmbH became part of the Austrian group EVN AG in October 2003. Construction of the plant started in September 2003. WTE chose French Degremont, water treatment unit of utilities conglomerate Suez, for the construction of the ultrafiltration unit at the South-West Moscow drinking water plant in June 2004. The plant was expected to start operations by 2007. Ten years after completion, the ownership of the plant was expected to be transferred to Moscow municipality-owned water utility, Mosvodokanal. In 2005 MIGA issued a guarantee of Euro 42.7 million ($56.4 million) to WTE Wassertechnik GmbH of Germany (WTE) for its Euro 47.5 million equity investment in WTE Sud-West of the Russian Federation. The guarantee spanned a period of 13 years and provided coverage against the risks of expropriation and breach of contract. The guaranteed replaced a 2004 shareholder loan and equity guarantee.

Original sector

Water and sewerage

Budget

Location

Country

Russia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Government, Water Supply and Storage, Warehouse, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project