logo

Southbound IH45 On Ramp 18 Inch Sewer Line Replacement

Sector: Water Supply and Storage • Location: Webster, Texas, United States of America

Source: Dodge USA

Project
Pre-Design

This project includes the construction of new 18-inch sanitary sewer lines to replace existing 10-inch sanitary sewer lines along the current alignment from the Lift Station #15 force main to the existing 18-inch sanitary sewer line along IH45.

Project Information FAQ

Project Information

4 Q
The project “Southbound IH45 On Ramp 18 Inch Sewer Line Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Webster, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Pre-Design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project includes the construction of new 18-inch sanitary sewer lines to replace existing 10-inch sanitary sewer lines along the current alignment from the Lift Station #15 force main to the existing 18-inch sanitary sewer line along IH45.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data