Southbridge Apartment/Retail Buildings Phase 1C
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
A 13 story, 141 feet tall midrise - White, black and gray metal panel exterior - No on site parking - The ground floor of the building will be anchored by a 1,500 square foot retail space on the main street corner - This will be joined by the residential lobby, bike parking room, as well as various utility rooms - 80-residential units made up of studios, one-, and two-bedroom layouts with 44 of th
- Status
- Prospective
- Sector
- Metal, Car parking, Automotive, Road, Power Transmission, Residential, Commercial, Power Generation (CCGT)
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Southbridge Apartment/Retail Buildings Phase 1C
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 13 story, 141 feet tall midrise - White, black and gray metal panel exterior - No on site parking - The ground floor of the building will be anchored by a 1,500 square foot retail space on the main street corner - This will be joined by the residential lobby, bike parking room, as well as various utility rooms - 80-residential units made up of studios, one-, and two-bedroom layouts with 44 of the 80 units being affordable - Top floor lounge, fitness room, tenant storage room, and a small ou... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Car parking, Automotive, Road, Power Transmission, Residential, Commercial, Power Generation (CCGT) |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
