logo
ProjectPlanned

Southeast Gateway Line (Phase 2)

The status, timeline and source of this project. A free account opens every field.

Source: Tunnel Business Magazine

The Southeast Gateway Line will feature 14.5 miles of new light rail connecting Slauson/A Line Station to Pioneer Station in Artesia, including 9 stations. The project is set to open in 2035, with construction starting after the Record of Decision in summer 2024.

Status
Prospective
Sector
Tunnel, Rail
Location
Los Angeles, California, United States of America
Updated
22 Jul 2026
Source
Tunnel Business Magazine

ConstructChat

Ask ConstructChat about Southeast Gateway Line (Phase 2)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Southeast Gateway Line (Phase 2)” is an infrastructure initiative in the Tunnel sector, located in Los Angeles, California, United States. Taiyo aggregates data on it from Tunnel Business Magazine.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Southeast Gateway Line will feature 14.5 miles of new light rail connecting Slauson/A Line Station to Pioneer Station in Artesia, including 9 stations. The project is set to open in 2035, with construction starting after the Record of Decision in summer 2024.

Original sector

Transportation

Location

Country

United States of America (USA)

State

California

City

Los Angeles

Source

Source

Tunnel Business Magazine

URL

More Details

Record type

Project

Sector

Tunnel, Rail

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project