Southeast Sewer Conversion Project Phase 9A
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Southeast Sewer Conversion Project - is a Federally Funded project. Carson City is accepting sealed bids for all labor, materials, equipment, and incidentals necessary for the Southeast Mandatory Sewer Extension Project Phase 9A. The project includes the installation of sewer mains and laterals for the residents located within Phases 9 and 10 of the City Master Plan. Bids must be submitted in
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Government, Commercial
- Location
- Carson City, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Southeast Sewer Conversion Project Phase 9A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Southeast Sewer Conversion Project - is a Federally Funded project. Carson City is accepting sealed bids for all labor, materials, equipment, and incidentals necessary for the Southeast Mandatory Sewer Extension Project Phase 9A. The project includes the installation of sewer mains and laterals for the residents located within Phases 9 and 10 of the City Master Plan. Bids must be submitted in accordance with the bid documents, drawings and plans, specifications, and special conditions rel... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Carson City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Government, Commercial |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
