Southeast Wastewater Treatment Plant Blower Replacement
Sector: Water Supply and Storage • Location: Carbondale, Illinois, United States of America
Source: Dodge USA
This project will replace the existing blower aeration system with a new system and new controls. The current system runs continuously 24 hours per day. The new system will utilize enhanced controls to operate more efficiently based on oxygen demand. Energy savings is projected to pay for the cost of the project within 3- 5 years, and grant funds may be available to pay for some of the cost. Porti
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)
- Location
- Carbondale, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Southeast Wastewater Treatment Plant Blower Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will replace the existing blower aeration system with a new system and new controls. The current system runs continuously 24 hours per day. The new system will utilize enhanced controls to operate more efficiently based on oxygen demand. Energy savings is projected to pay for the cost of the project within 3- 5 years, and grant funds may be available to pay for some of the cost. Portions of the existing blower system will remain in place, but will be controlled as part of the new... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Carbondale |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
