Southeast Water Transmission Main - Package 2B
Sector: Water Supply and Storage • Location: Lake Wales, Florida, United States of America
Source: Dodge
The scope of work involves the construction of approximately 7.65 miles of potable water transmission pipeline. The pipeline consists of approximately 1.5 miles of HDPE pipe, 6 miles of 36-inch and 30-inch diameter ductile iron pipe, and pipe appurtenances such as air release assemblies and blow-offs. The pipeline drawings begin north of Lake Wales, Florida, near the intersection of Old Scenic Hig
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Steel, Metal, Commercial
- Location
- Lake Wales, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Southeast Water Transmission Main - Package 2B
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work involves the construction of approximately 7.65 miles of potable water transmission pipeline. The pipeline consists of approximately 1.5 miles of HDPE pipe, 6 miles of 36-inch and 30-inch diameter ductile iron pipe, and pipe appurtenances such as air release assemblies and blow-offs. The pipeline drawings begin north of Lake Wales, Florida, near the intersection of Old Scenic Highway and North Scenic Highway. The project proceeds east through the Mountain Lake development. T... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Lake Wales |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Steel, Metal, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
