logo

Southeastern Trail Expansion Project

Sector: Natural Gas • Location: World

Source: Hydrocarbon Technology

Project
Closed

The Southeastern Trail expansion project will be undertaken in Virginia, US. Credit: Williams. Southeastern Trail expansion is an expansion of the Transco pipeline. Credit: Williams. Southeastern Trail expansion pipeline will have a capacity of 296,375dt/d. Credit: Williams. The Southeastern Trail expansion project is an expansion of the Transcontinental Gas Pipe Line Company (Transco)’s 16,093km

Project Information FAQ

Project Information

3 Q
The project “Southeastern Trail Expansion Project” is an infrastructure initiative in the Natural Gas sector, located in World. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Southeastern Trail expansion project will be undertaken in Virginia, US. Credit: Williams. Southeastern Trail expansion is an expansion of the Transco pipeline. Credit: Williams. Southeastern Trail expansion pipeline will have a capacity of 296,375dt/d. Credit: Williams. The Southeastern Trail expansion project is an expansion of the Transcontinental Gas Pipe Line Company (Transco)’s 16,093km interstate gas transmission pipeline system located in Virginia, US. A wholly owned subsidiary of Williams Partners, Transco supplies natural gas through the pipeline system that extends from South Texas to New York City. It is the largest-volume interstate natural gas pipeline system in the US, delivering approximately 15% of the country’s demand. The Southeastern Trail expansion project will expand the pipeline’s capacity by 296,375 dekatherms per day (dt/d) to serve utility and local distribution companies in the states of Georgia, Virginia, North Carolina and South Carolina. It will serve PSNC Energy, South Carolina Electric & Gas, Virginia Natural Gas, and the cities of Buford and LaGrange in Georgia. The project received approval from the Federal Energy Regulatory Commission in October 2019 and will be developed with an estimated investment of $404.8m. It is expected to be in service by November 2020. It will provide a reliable gas supply for Transco’s existing customers by meeting the demand for the 2020-21 heating season, as well as the future. The Southeastern Trail expansion will comprise 12.4km of 42in-diameter pipeline looping facilities in Virginia, known as the Manassas loop. It will also include the addition of 60,720HP at existing compressor stations in Virginia, and piping and valve improvements at existing facilities in Georgia, Louisiana, and South Carolina. The pipeline will start at the mainline valve (MLV) 180-15 site in Fauquier County to advance adjacent to the Transco mainline to connect with the Nokesville Meter Station in Prince William County. It will run along the Transco Mainline right-of-way through most of its route. One of the existing compression unit-11 drivers at Station 185 in Prince William County will be uprated from 25,000HP to 30,000HP along with regearing of the associated variable speed drive. The existing electric-driven compression unit-1 driver will be uprated from 33,000HP to 41,250HP and the existing centrifugal compressor rewheeled. Station 165 in Pittsylvania County will be added with two new turbine-driven 22,490HP compression units. The existing reciprocating compressor units one through ten at the station will be demolished. The existing units 11 and 12 will be improved. Transco facilities in Georgia, Louisiana, and South Carolina will be modified to include flow reversal and deodorisation of controlled gas release points on the pipeline system. These modifications will be undertaken at St Helena Parish in Louisiana, Coweta, Carroll, Henry, Walton and Madison in Georgia, and Anderson County and Spartanburg in South Carolina. Modifications for supplemental mainline deodorisation will be undertaken for 13 existing MLV facilities in South Carolina and Georgia along the Transco mainline. One new MLV facility will be installed while two existing MLV facilities will be expanded along the Manassas Loop. Transco intends to incorporate remotely operated MLVs with provision for manual operation, which will be controlled from the Transco Pipeline Control Houston facility in Texas. Construction is expected to last for approximately 11 months. The construction of the Manassas Loop will be undertaken in one stretch in a north-to-south direction. Transco will construct two new roads to access the construction right-of-way for the pipeline. The access roads will be restored to either pre-construction condition or better condition as per the request of the landowners. Additional temporary construction and staging areas will be developed along with contractor yards, with one of the yards proposed to be built in Fauquier County.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data