Southern Embankment Reach SE-3 FMMA Flood Risk Management
Sector: Water Supply and Storage • Location: Fargo, North Dakota, United States of America
Source: Dodge USA
This is a pre-solicitation notice, and as such, any additional information as to the size and/or scope of the project will not be available until the issuance of the Invitation for Bid (IFB). The U.S. Army Corps of Engineers (USACE), St. Paul District has a requirement for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3. The Fargo Moorhead Metropo
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Fargo, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Southern Embankment Reach SE-3 FMMA Flood Risk Management
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is a pre-solicitation notice, and as such, any additional information as to the size and/or scope of the project will not be available until the issuance of the Invitation for Bid (IFB). The U.S. Army Corps of Engineers (USACE), St. Paul District has a requirement for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3. The Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3, is located in Cass Coun... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Fargo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
