Southern Loop Sewer Improvements Phase 2A
Sector: Water Supply and Storage • Location: Camden, South Carolina, United States of America
Source: Dodge USA
The Project consists of: Approximately 5,500 If of 12" PVC FM, 1050 If of HDD, 400 If of 12" DIP in 24" steel encasement, 480 If of 12" DIP in 30" steel encasement, Judy PS modification, 3 connections to existing system and appurtenances
- Status
- Prospective
- Sector
- Water Supply and Storage, Steel, Waste Processing and Treatment, Government, Metal, Commercial
- Location
- Camden, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Southern Loop Sewer Improvements Phase 2A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of: Approximately 5,500 If of 12" PVC FM, 1050 If of HDD, 400 If of 12" DIP in 24" steel encasement, 480 If of 12" DIP in 30" steel encasement, Judy PS modification, 3 connections to existing system and appurtenances |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Camden |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Waste Processing and Treatment, Government, Metal, Commercial |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
