Southern Loop Sewer Improvements Phase 2A
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project consists of: Approximately 5,500 If of 12" PVC FM, 1050 If of HDD, 400 If of 12" DIP in 24" steel encasement, 480 If of 12" DIP in 30" steel encasement, Judy PS modification, 3 connections to existing system and appurtenances
- Status
- Closed
- Sector
- Steel, Waste Processing and Treatment, Water Supply and Storage, Government, Metal, Commercial
- Location
- Camden, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Southern Loop Sewer Improvements Phase 2A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of: Approximately 5,500 If of 12" PVC FM, 1050 If of HDD, 400 If of 12" DIP in 24" steel encasement, 480 If of 12" DIP in 30" steel encasement, Judy PS modification, 3 connections to existing system and appurtenances |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Camden |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Waste Processing and Treatment, Water Supply and Storage, Government, Metal, Commercial |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
