Southern Peripheral Road (SPR) Redevelopment
Sector: Road • Location: Gurgaon, Haryana, India
Source: Times of India
The redevelopment of the Southern Peripheral Road includes the development of an elevated corridor between Ghata Chowk and Vatika Chowk, covering a 12-km stretch from Ghata Chowk to NH-8. The redevelopment will be carried out in two phases, starting with the 5.5-km stretch between Vatika Chowk and NH-8, including an interchange at Vatika Chowk to connect with the Sohna elevated corridor.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | approved |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The redevelopment of the Southern Peripheral Road includes the development of an elevated corridor between Ghata Chowk and Vatika Chowk, covering a 12-km stretch from Ghata Chowk to NH-8. The redevelopment will be carried out in two phases, starting with the 5.5-km stretch between Vatika Chowk and NH-8, including an interchange at Vatika Chowk to connect with the Sohna elevated corridor. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
