logo

Southern Seawater Desalination Plant, Australia

Sector: Airport • Location: Thailand

Source: Water Technology

Project
Closed

The Southern Seawater Desalination Plant (SSDP) is Western Australia's second major desalination project. The plant is located at Taranto Road, north of Binningup, approximately 150km south of Perth. Image courtesy of Water Corporation. The SSDP is being constructed in two stages. The first stage was completed in September 2011 at an investment of A$955m. Image courtesy of Water Corporation. The h

Project Information FAQ

Project Information

4 Q
The project “Southern Seawater Desalination Plant, Australia” is an infrastructure initiative in the Airport sector, located in Thailand. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Southern Seawater Desalination Plant (SSDP) is Western Australia's second major desalination project. The plant is located at Taranto Road, north of Binningup, approximately 150km south of Perth. Image courtesy of Water Corporation. The SSDP is being constructed in two stages. The first stage was completed in September 2011 at an investment of A$955m. Image courtesy of Water Corporation. The heavy lift vessel Happy Buccaneer was engaged to position the seawater intake towers on the seabed. The second stage of the SSDP is expected to come online in December 2012. Image courtesy of Water Corporation. The new plant is located on Taranto Road, north of Binningup, approximately 150km south of Perth. It is being built in two stages, each with a maximum capacity of 50 gigalitres (GL) a year. The first stage of the plant was officially opened in September 2011. It was completed three months ahead of schedule and required an investment of A$955m ($943.5m). The plant has started operating at its full capacity. The second stage of the project was announced in August 2011. It will involve an expansion of the plant’s capacity, from 50GL/year to 100GL/year. The expansion is expected to cost A$450m ($444.6m). The state government has already approved funding of A$300m ($296.4m), to put towards the expansion. The first intake of seawater into the second stage of the plant took place in January 2013. The expansion is expected to be completed after the installation and testing of four pumps in March 2013. The plant is owned by Water Corporation, which is the main provider of water, wastewater and drainage services in Western Australia. In addition to the state capital, the new plant will supply water to the nearby city of Bunbury, located 175km south of Perth’s central business district (CBD). The project was named the Global Desalination Plant of the Year in April 2012 at the Global Water Summit held in Rome. The first stage of the project involved construction of a seawater reverse osmosis (SWRO)-based, 50GL/year capacity desalination plant that can be expanded to 100GL/year. It also included pre-treatment and post-treatment facilities. The second component of the project is the 28km long underground pipeline from Binningup to a storage facility comprised of four summit tanks, located north-east of Harvey. The pipeline will facilitate the transfer of potable water from the plant to the integrated water supply scheme (IWSS). Other components of the project include a seawater pump station, a seawater intake pipeline to feed seawater into the seawater pump station and a two kilometre pipeline, to deliver the water from the storage facility in Harvey into the Stirling-Harvey Trunk main. The proposal for the SSDP was announced by the Premier of Western Australia in May 2007. Following the announcement, Water Corporation engaged consultants to conduct various studies to assist with the project design and meet the statutory requirements of the Federal Department of Environment and Water Resources (DEW) and Western Australia’s Department of Environment and Conservation (DEC). Water Corporation received conditional environmental approval for the plant in June 2009. Construction on the new plant commenced in July 2009, after receiving full project approval from the Federal Government. Environmental management consultancy 360 Environmental was commissioned in July 2007 to conduct flora and fauna investigations at the plant and pipeline locations. KBR was engaged to undertake an oceanographic survey, preliminary diffuser design, marine hydrodynamic modelling, coastal processes, sediment characterisation, water characteristics, bio-monitoring and benthic habitat studies. A noise survey was completed by Herring Storer Acoustics. The social impact assessment and sustainability statement were completed by GHD. Brad Goode and Associates was commissioned in January 2008 to conduct a Site Identification Aboriginal Heritage Survey. WorleyParsons had undertaken comparison of the three shortlisted sites. The Southern SeaWater Alliance (SSWA) was awarded the design, build and operate (DBO) contract for the desalination plant in late June 2009. The SSWA consortium is headed by two multidiscipline construction companies, Tecnicas Reunidas (38%) and Valoriza Agua (38%). Engineering consultancy firm WorleyParsons (five percent) and construction company AJ Lucas (19%) are the partners. The DBO contract entitles SSWA to operate the plant for 25 years. Design and installation of seven sectional bolted tanks for the second phase of the project was contracted to pmt Water Engineering. Energy Recovery has been contracted to supply its PX Pressure Exchangera (PXa) devices for the second phase of the project. The SSDP is part of Water Corporation’s strategic approach for long-term water sustainability. The desalination plant was ordered in response to the reduced rainfall in the state, population growth and subsequent increase in water consumption. Western Australia has witnessed a 12% decline in rainfall during the last ten years. This has lowered the flows of stream into the dams by up to 50%. It has been estimated that the state’s capital will require an additional 150 billion litres of water by 2031. In order to address these needs, the South Australian Government commissioned the Southern Seawater desalination project. The new plant has the potential to deliver 30% of the state’s water supply from climate independent water sources. It is expected to deliver total potable water savings of up to 1,200GL a year. Wonthaggi desalination plant will be the largest in Australia. With the official opening of the Perth Seawater Reverse Osmosis Plant in November 2006, Western Australia became the first state in the country to use desalination as a major public water source. Kurnell desalination plant is located in south Sydney, New South Wales (NSW), Australia. The Gold Coast Desalination Plant is a reverse osmosis (RO) seawater desalination facility located in Tugun, adjacent to Gold Coast Airport, South East Queensland.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data