Southern Spine Distribution Main-Section 22
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: Dodge USA
rehab existing 48 inch pipe The Massachusetts Water Resources Authority may be seeking a consultant to provide design and engineering services during construction for Section 22 and Section 21 of the Southern Spine distribution mains project.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Milton, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Southern Spine Distribution Main-Section 22
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | rehab existing 48 inch pipe The Massachusetts Water Resources Authority may be seeking a consultant to provide design and engineering services during construction for Section 22 and Section 21 of the Southern Spine distribution mains project. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Milton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
