Southern Tire Mart #623 - Midway, FL
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge
NEW Southern Tire Mart at an existing Pilot Truck Stop. Existing parking lot and building demo with grading (2.63 ac disturbed), utilities, curb, asphalt, misc. concrete, fencing, and other site improvements per plans and specifications. New Pre-engineered Metal Building 4-bays (10,769 SF) with 586 SF of finished office space, mechanical mezzanine & complete mechanical, plumbing, & electrical serv
- Status
- Closed
- Sector
- Power Generation (CCGT), Car parking, Road, Automotive, Cement, Power Transmission, Metal, Manufacturing (Industrial), Commercial, Residential
- Location
- Midway, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Southern Tire Mart 623 - Midway, FL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NEW Southern Tire Mart at an existing Pilot Truck Stop. Existing parking lot and building demo with grading (2.63 ac disturbed), utilities, curb, asphalt, misc. concrete, fencing, and other site improvements per plans and specifications. New Pre-engineered Metal Building 4-bays (10,769 SF) with 586 SF of finished office space, mechanical mezzanine & complete mechanical, plumbing, & electrical services |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Midway |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Car parking, Road, Automotive, Cement, Power Transmission, Metal, Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
