logo

Southern Tire Mart #623

Sector: Automotive • Location: Midway, Florida, United States of America

Source: Dodge USA

Project
Closed

NEW Southern Tire Mart at an existing Pilot Truck Stop. Existing parking lot and building demo with grading (2.63 ac disturbed), utilities, curb, asphalt, misc. concrete, fencing, and other site improvements per plans and specifications. New Pre-engineered Metal Building 4-bays (10,769 SF) with 586 SF of finished office space, mechanical mezzanine & complete mechanical, plumbing, & electrical serv

Status
Closed
Sector
Automotive, Metal, Cement, Commercial, Power Transmission, Road, Residential, Car parking, Power Generation (CCGT), Manufacturing (Industrial)
Location
Midway, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Southern Tire Mart #623

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Southern Tire Mart 623” is an infrastructure initiative in the Automotive sector, located in Midway, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

NEW Southern Tire Mart at an existing Pilot Truck Stop. Existing parking lot and building demo with grading (2.63 ac disturbed), utilities, curb, asphalt, misc. concrete, fencing, and other site improvements per plans and specifications. New Pre-engineered Metal Building 4-bays (10,769 SF) with 586 SF of finished office space, mechanical mezzanine & complete mechanical, plumbing, & electrical services

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Midway

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Automotive, Metal, Cement, Commercial, Power Transmission, Road, Residential, Car parking, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project