Southern University Gym Complex Phase 1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Project consists of all work associated with the construction of a new gymnasium complex. Construction of new 24,000 SF gymnasium. Minor sitework including new sidewalks and catch basins. Concrete foundation. Minor structural steel framing. Pre - engineered metal building system (PEMB). Standing seam metal roof system. Masonry veneer with metal siding. Aluminum storefront glazing system and curtai
- Status
- Closed
- Sector
- Power Generation (CCGT), Car parking, Automotive, Cement, Education, Steel, Metal, Commercial
- Location
- Shreveport, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Southern University Gym Complex Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of all work associated with the construction of a new gymnasium complex. Construction of new 24,000 SF gymnasium. Minor sitework including new sidewalks and catch basins. Concrete foundation. Minor structural steel framing. Pre - engineered metal building system (PEMB). Standing seam metal roof system. Masonry veneer with metal siding. Aluminum storefront glazing system and curtain wall glazing system. Interior finish out. Plumbing systems. HVAC systems. Electrical power and ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Shreveport |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Car parking, Automotive, Cement, Education, Steel, Metal, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
