logo

Southside Boulevard resurfacing from JTB to U.S. 1/Southside at Deerwood Park Interchange improvements

Sector: Road • Location: Jacksonville, Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Active

The Florida Department of Transportation is making changes to the intersection of Southside Boulevard and Deerwood Park Boulevard/A.C. Skinner Parkway. The improvements to this intersection will enhance the flow of traffic in all directions. Starting in the SB direction of Southside Blvd, new movements will include a combined right turn lane to access AC Skinner Pkwy while providing a through lane

Project Information FAQ

Project Information

5 Q
The project “Southside Boulevard resurfacing from JTB to U.S. 1/Southside at Deerwood Park Interchange improvements” is an infrastructure initiative in the Road sector, located in Jacksonville, Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Florida Department of Transportation is making changes to the intersection of Southside Boulevard and Deerwood Park Boulevard/A.C. Skinner Parkway. The improvements to this intersection will enhance the flow of traffic in all directions. Starting in the SB direction of Southside Blvd, new movements will include a combined right turn lane to access AC Skinner Pkwy while providing a through lane to the service Rd. Additionally, a double left U-turn, south of the intersection, will be installed eliminating the existing left turn movement immediately at the intersection. Motorists traveling Northbound on Southside Blvd will benefit from a new signalized double right turn lane onto Deerwood Blvd. and an identical U-turn just north of the intersection to access AC Skinner Pkwy. Deerwood Blvd. will enhance left turn movements by increasing the travel lanes from the existing two to three while also dedicating a right turn slip lane providing motorists the opportunity to accelerate into oncoming traffic. The through lane from AC Skinner Blvd to Deerwood Blvd will be eliminated, however, the left turn movements will be increased to two lanes along with a signalized right turn lane allowing for traffic to accelerated on SB Southside Blvd.These changes will create better flow in the corridor and reduce congestion by allowing more green-light time for north and southbound Deerwood Park Boulevard and improving safety by reducing the number of conflict points at the intersection. Improvements include milling and resurfacing, shoulder treatment, drainage upgrades, sidewalks, crosswalks, new traffic signals, highway signage, lighting, and other incidental construction. The project will also enhance traffic flow at the intersection by adding travel lanes and implementing new movements for left and right turns. A companion project (445340-1) includes milling and resurfacing Southside Boulevard from Butler Boulevard (State Road 202) to Philips Highway. Project video is also available here.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data