logo
ProjectClosed

Southside Inclusive Playground Surfacing

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Southside inclusive playground rubber surface. The City of Swift Current, Saskatchewan would appreciate receiving a proposal on the Installation of a Rubber Pour-inplace surface meeting or exceeding the following general requirements: Install base prior to structure installation, after structure install Installation of base material (spec provided) in compliance with ASTM F1292/CSA-Z614 standard I

Status
Closed
Sector
Car parking, Government, Automotive, Commercial
Location
Swift Current, Saskatchewan, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Southside Inclusive Playground Surfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Southside Inclusive Playground Surfacing” is an infrastructure initiative in the Car parking sector, located in Swift Current, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Southside inclusive playground rubber surface. The City of Swift Current, Saskatchewan would appreciate receiving a proposal on the Installation of a Rubber Pour-inplace surface meeting or exceeding the following general requirements: Install base prior to structure installation, after structure install Installation of base material (spec provided) in compliance with ASTM F1292/CSA-Z614 standard Installation on a date approved by the City of Swift Current Finished Surface to meet or exceed fa...

Procurement method

Budget

Location

Country

Canada

State

Saskatchewan

City

Swift Current

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Car parking, Government, Automotive, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project