Southwest 34th Terrace Drainage Project
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project work includes the installation of new catch basin inlets, drainage piping, regrade swales, and install new piping along SW 34th Terrace. The project also involves raising two existing outfalls that discharge into the Dania Cut-Off Canal.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Raw Materials, Waste Processing and Treatment
- Location
- Fort Lauderdale, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Southwest 34th Terrace Drainage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project work includes the installation of new catch basin inlets, drainage piping, regrade swales, and install new piping along SW 34th Terrace. The project also involves raising two existing outfalls that discharge into the Dania Cut-Off Canal. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Fort Lauderdale |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Raw Materials, Waste Processing and Treatment |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
