logo

Southwest Integrated Transport System (ITS/Parañaque Integrated Terminal Exchange) PPP project

Sector: Commercial • Location: Philippines

Source: InfraPPPWorld

Project
Closed

The project includes the financing, design and construction of a passenger terminal building in Parañaque City. The Southwest Terminal will be constructed within a site area of 4.59 hectares. It will connect all provincial buses from Cavite to other modes of transport serving Metro Manila such as buses, taxis, app-based transport, and a walkway to the future LRT 1 South Extension.The developers wi

Project Information FAQ

Project Information

5 Q
The project “Southwest Integrated Transport System (ITS/Parañaque Integrated Terminal Exchange) PPP project” is an infrastructure initiative in the Commercial sector, located in Philippines. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes the financing, design and construction of a passenger terminal building in Parañaque City. The Southwest Terminal will be constructed within a site area of 4.59 hectares. It will connect all provincial buses from Cavite to other modes of transport serving Metro Manila such as buses, taxis, app-based transport, and a walkway to the future LRT 1 South Extension.The developers will deliver arrival and departure bays, public information system, ticketing and baggage handling facilities and park-ride facilities. The winning contractor will also operate and maintain the terminal for a period of 35 years.The project will be implemented using a Build-Transfer-Operate arrangement.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data